Language:

Beyond the obvious: local economic costs of the São Luiz do Tapajós dam

Series number: 
33

Evaluación de efectos ambientales derivados de la instalación de cinco centrales hidroeléctricas en el Río Marañón

Subsidizing Socio-environmental Compensation Processes in the Brazilian Amazon: Impact Analysis of the Teles-Pires dam

CSF is conducting an economic analysis of the impacts of the Teles-Pires dam construction in the Brazilian Amazon, to help: (1) define socio-environmental compensation values more aligned with the well-being loss perception of the affected local community via an effective economic valuation method; (2) raise local awareness of dam impacts; and (3) defend the rights of people affected by the construction.

Contributing to the decision-making process about hydropower plants in the Brazilian Amazon region: Study of the financial feasibility and potential impacts of the Castanheira Dam

Conservação Estratégica (CSF-Brazil), in partnership with Instituto Centro de Vida (ICV), International Rivers and Operação Amazônia Nativa (OPAN), is carrying out a detailed study on the construction of the proposed hydropower plant Castanheira in the Arinos river, in the state of Mato Grosso, Brazil. This study has three goals: (1) evaluate the financial feasibility of the project; (2) contribute to the analysis of socio-environmental impacts associated with the construction of hydroelectric dams in the Amazon region; and (3) assist the decision makers about this kind of infrastructure work through a cost-benefit analysis of the dam.

Syndicate content