HydroCalculator

Bala 2, Rurrenabaque, Beni Department, Bolivia

River: Beni

Status: Proposed project

2 hectares per MW

0 people per MW

Map of Rurrenabaque, Beni Department, Bolivia
Enable javascript to view charts.

Results

Net Present Value3,198 million USD
NPV including net greenhouse gas emissions3,553 million USD
Internal Rate of Return18.8%
Cost per MWh excluding environmental costs7 USD per MWh
Hectares flooded per MW2 hectares per MW
Gross CO₂ equivalent emissions6,762 thousand metric tonnes
Gross CO₂ equivalent per MW2,049 metric tonnes per MW
Hectares flooded per MW2 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced900 people displaced
Area flooded6,600 hectares
Carbon density193 tC/ha
Installed capacity 3,300 MW
Capacity used70%
Construction time5 years
Construction cost1,215,000,000 USD
Transmission infrastructure cost90,000,000 USD
Wholesale price of energy20 USD
Economic discount rate6%