Belo Monte, Altamira, Brazil, Brazil

Status: Proposed project

4 hectares per MW

Mix of crops & tropical rainforest (50/50)

0 people per MW

Javascript is required to view this map.

Analysis table

Results

Net Present Value: 
-3,364 million BRL
Hectares flooded per MW: 
4 hectares per MW
Gross CO₂ equivalent emissions: 
16,005 thousand metric tonnes
Gross CO₂ equivalent per MW: 
1,455 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
11,000 MW
Capacity used: 
50%
Area flooded: 
45,000 hectares
Vegetation type: 
Mix of crops & tropical rainforest (50/50)
People displaced: 
1,000 people displaced
Construction time: 
5 years
Construction cost: 
25,000,000,000 BRL
Transmission infrastructure cost: 
0 BRL
Wholesale price of energy: 
81 BRL
Economic discount rate: 
10%

Comments

Too big, too costly to local industry

I really think that this is too costly to the local industry. The local government will opose this, and I hope make sure that the issues are known and understood among the developers and ministry of economic development.

I too will oppose such a large damaging hydro electric station in this area.

Other analyses of the Belo Monte project

Details Links Capacity (MW) Net Present Value CO₂ emissions (t/MW) Inundated land (ha/MW) Displaced people / MW
vijaylaxsmi, Amazonas, Brasil, Under construction View 11,200 MW 3,282 million BRL 28,000 4.6 2
vijaylaxsmi, Amazonas, Brasil, Under construction View 11,200 MW -19,239 million BRL 14,000 4.6 2
avivaimhof, Altamira, Brazil, Proposed project View 11,200 MW -4,762 million BRL 1,600 4.6 2