Belo Monte, Altamira, Brazil, Brazil

Status: Proposed project

5 hectares per MW

Mix of crops & tropical rainforest (50/50)

2 people per MW

Javascript is required to view this map.

Be the first to start a conversation by posting a comment

Add a comment


Analysis table

Results

Net Present Value: 
-4,762 million BRL
Hectares flooded per MW: 
5 hectares per MW
Gross CO₂ equivalent emissions: 
18,352 thousand metric tonnes
Gross CO₂ equivalent per MW: 
1,639 metric tonnes per MW
People displaced per megawatt: 
2 people per MW

Inputs and assumptions

Installed capacity : 
11,200 MW
Capacity used: 
40%
Area flooded: 
51,600 hectares
Vegetation type: 
Mix of crops & tropical rainforest (50/50)
People displaced: 
20,000 people displaced
Construction time: 
5 years
Construction cost: 
19,000,000,000 BRL
Transmission infrastructure cost: 
5,000,000,000 BRL
Wholesale price of energy: 
83 BRL
Economic discount rate: 
10%

Other analyses of the Belo Monte project

Details Links Capacity (MW) Net Present Value CO₂ emissions (t/MW) Inundated land (ha/MW) Displaced people / MW
John Reid, Altamira, Brazil, Proposed project View 11,000 MW -3,364 million BRL 1,500 4.1 0.09
vijaylaxsmi, Amazonas, Brasil, Under construction View 11,200 MW 3,282 million BRL 28,000 4.6 2
vijaylaxsmi, Amazonas, Brasil, Under construction View 11,200 MW -19,239 million BRL 14,000 4.6 2