11 thousand MW capacity
Belo Monte, Altamira, Brazil, Brazil
Status: Proposed project
52 thousand hectares flooded
5 hectares per MW
Mix of crops & tropical rainforest (50/50)
-5 billion BRL
net present value
(Excluding environmental costs)
Javascript is required to view this map.
Be the first to start a conversation by posting a comment
Analysis table
Results
Net Present Value:
-4,762 million BRL
Hectares flooded per MW:
5 hectares per MW
Gross CO₂ equivalent emissions:
18,352 thousand metric tonnes
Gross CO₂ equivalent per MW:
1,639 metric tonnes per MW
People displaced per megawatt:
2 people per MW Inputs and assumptions
Installed capacity :
11,200 MW
Capacity used:
40%
Area flooded:
51,600 hectares
Vegetation type:
Mix of crops & tropical rainforest (50/50)
People displaced:
20,000 people displaced
Construction time:
5 years
Construction cost:
19,000,000,000 BRL
Transmission infrastructure cost:
5,000,000,000 BRL
Wholesale price of energy:
83 BRL
Economic discount rate:
10% avivaimhof
2 April 2010 – 5:06pm
Other analyses of the Belo Monte project
| Details | Links | Capacity (MW) | Net Present Value | CO₂ emissions (t/MW) | Inundated land (ha/MW) | Displaced people / MW |
|---|---|---|---|---|---|---|
| John Reid, Altamira, Brazil, Proposed project | View | 11,000 MW | -3,364 million BRL | 1,500 | 4.1 | 0.09 |
| vijaylaxsmi, Amazonas, Brasil, Under construction | View | 11,200 MW | 3,282 million BRL | 28,000 | 4.6 | 2 |
| vijaylaxsmi, Amazonas, Brasil, Under construction | View | 11,200 MW | -19,239 million BRL | 14,000 | 4.6 | 2 |
Sign in or register now to create a new analysis.
HydroCalculator Tool Help
CSF e-newsletter
I want to know the latest conservation news, and hear about upcoming CSF projects and courses.
Upcoming CSF Courses
CSF offers training in economic tools to empower local conservation organizations, decision-makers, and communities.
Herramientas Económicas para la Conservación en la Amazonía Andina - Perú 2012
Monday, 28 May, 2012 - Friday, 8 June, 2012
Friday, 23 March 2012
Economic Tools for Conservation and Infrastructure Planning in the Albertine Rift
Monday, 11 June, 2012 - Friday, 22 June, 2012
Monday, 30 April 2012
Ferramentas Econômicas para a Conservação e Planejamento de Infraestrutura na Amazônia - Formulário de Inscrição
Monday, 13 August, 2012 - Friday, 24 August, 2012
Saturday, 16 June 2012
20 thousand people displaced
2 people per MW