HydroCalculator

Belo Monte, Altamira, Brazil, Brazil

Status: Proposed project

4 hectares per MW

0 people per MW

Results

Net Present Value-3,364 million BRL
Hectares flooded per MW4 hectares per MW
Gross CO₂ equivalent emissions16,005 thousand metric tonnes
Gross CO₂ equivalent per MW1,455 metric tonnes per MW
Hectares flooded per MW4 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced1,000 people displaced
Area flooded45,000 hectares
Installed capacity 11,000 MW
Capacity used50%
Construction time5 years
Construction cost25,000,000,000 BRL
Transmission infrastructure cost0 BRL
Wholesale price of energy81 BRL
Economic discount rate10%

Comments

I really think that this is too costly to the local industry. The local government will opose this, and I hope make sure that the issues are known and understood among the developers and ministry of economic development.

I too will oppose such a large damaging hydro electric station in this area.

Post new comment

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <code> <pre> <ul> <ol> <li> <dl> <dt> <dd> <span> <blockquote> <div> <img> <del> <ins> <h2> <h3>
  • Lines and paragraphs break automatically.

More information about formatting options

Type the characters you see in this picture. (verify using audio)
Type the characters you see in the picture above; if you can't read them, submit the form and a new image will be generated. Not case sensitive.