990 MW capacity
Cachuela Esperanza, Guayaramerin, Beni, Bolivia
River: Beni
Status: Proposed project
2 thousand hectares flooded
2 hectares per MW
Mix of crops & tropical rainforest (50/50)
-1,209 million USD
net present value
(Excluding environmental costs)
Javascript is required to view this map.
Be the first to start a conversation by posting a comment
Analysis table
Results
Net Present Value:
-1,209 million USD
NPV including net greenhouse gas emissions:
-1,175 million USD
Internal Rate of Return:
3.19%
Hectares flooded per MW:
2 hectares per MW
Gross CO₂ equivalent emissions:
6,136 thousand metric tonnes
Gross CO₂ equivalent per MW:
6,198 metric tonnes per MW
People displaced per megawatt:
2 people per MW Inputs and assumptions
Installed capacity :
990 MW
Capacity used:
50%
Area flooded:
2,000 hectares
Vegetation type:
Mix of crops & tropical rainforest (50/50)
People displaced:
2,000 people displaced
Construction time:
5 years
Construction cost:
2,000,000,000 USD
Transmission infrastructure cost:
80,000,000 USD
Wholesale price of energy:
40 USD
Economic discount rate:
12.8% Anonymous
14 September 2011 – 4:20pm
Other analyses of the Cachuela Esperanza project
| Details | Links | Capacity (MW) | Net Present Value | CO₂ emissions (t/MW) | Inundated land (ha/MW) | Displaced people / MW |
|---|---|---|---|---|---|---|
| Guayaramerin, Beni, Proposed project | View | 990 MW | -1,104 million USD | 5,800 | 2.0 | 3 |
| Cecilia Ayala, Guayaramerin, Beni, Construction Scheduled | View | 990 MW | -1,249 million USD | 39,000 | 7.0 | 3 |
Sign in or register now to create a new analysis.
HydroCalculator Tool Help
CSF e-newsletter
I want to know the latest conservation news, and hear about upcoming CSF projects and courses.
Upcoming CSF Courses
CSF offers training in economic tools to empower local conservation organizations, decision-makers, and communities.
Herramientas Económicas para la Conservación en la Amazonía Andina - Perú 2012
Monday, 28 May, 2012 - Friday, 8 June, 2012
Friday, 23 March 2012
Economic Tools for Conservation and Infrastructure Planning in the Albertine Rift
Monday, 11 June, 2012 - Friday, 22 June, 2012
Monday, 30 April 2012
Ferramentas Econômicas para a Conservação e Planejamento de Infraestrutura na Amazônia - Formulário de Inscrição
Monday, 13 August, 2012 - Friday, 24 August, 2012
Friday, 1 June 2012
2 thousand people displaced
2 people per MW