Cachuela Esperanza, Guayaramerin, Beni, Bolivia

River: Beni

Status: Proposed project

2 hectares per MW

Mix of crops & tropical rainforest (50/50)

2 people per MW

Javascript is required to view this map.

Be the first to start a conversation by posting a comment

Add a comment


Analysis table

Results

Net Present Value: 
-1,209 million USD
NPV including net greenhouse gas emissions: 
-1,175 million USD
Internal Rate of Return: 
3.19%
Hectares flooded per MW: 
2 hectares per MW
Gross CO₂ equivalent emissions: 
6,136 thousand metric tonnes
Gross CO₂ equivalent per MW: 
6,198 metric tonnes per MW
People displaced per megawatt: 
2 people per MW

Inputs and assumptions

Installed capacity : 
990 MW
Capacity used: 
50%
Area flooded: 
2,000 hectares
Vegetation type: 
Mix of crops & tropical rainforest (50/50)
People displaced: 
2,000 people displaced
Construction time: 
5 years
Construction cost: 
2,000,000,000 USD
Transmission infrastructure cost: 
80,000,000 USD
Wholesale price of energy: 
40 USD
Economic discount rate: 
12.8%

Other analyses of the Cachuela Esperanza project

Details Links Capacity (MW) Net Present Value CO₂ emissions (t/MW) Inundated land (ha/MW) Displaced people / MW
Guayaramerin, Beni, Proposed project View 990 MW -1,104 million USD 5,800 2.0 3
Cecilia Ayala, Guayaramerin, Beni, Construction Scheduled View 990 MW -1,249 million USD 39,000 7.0 3