Cachuela Esperanza OZ, Guayaramerin, Beni, Bolivia

River: Madera

Status: Construction Scheduled

70 hectares per MW

Tropical rain forest

3 people per MW

Javascript is required to view this map.

Analysis table

Results

Net Present Value: 
-11,232 thousand USD
NPV including net greenhouse gas emissions: 
-180,565 thousand USD
Internal Rate of Return: 
11.9%
Hectares flooded per MW: 
70 hectares per MW
Gross CO₂ equivalent emissions: 
397,526 thousand metric tonnes
Gross CO₂ equivalent per MW: 
401,542 metric tonnes per MW
People displaced per megawatt: 
3 people per MW

Inputs and assumptions

Installed capacity : 
990 MW
Capacity used: 
65%
Area flooded: 
69,000 hectares
Vegetation type: 
Tropical rain forest
People displaced: 
3,000 people displaced
Construction time: 
8 years
Construction cost: 
2,500,000,000 USD
Transmission infrastructure cost: 
10,000,000 USD
Wholesale price of energy: 
100 USD
Economic discount rate: 
12%

Comments

Precio electricidad

En que se basa la premisa de US$100/MWh?