Coca Codo Sinclair, Provincia Napo; Cantón El Chaco; Sistema hidrográfico Napo; Río Coca, Ecuador

Status: Under construction

0 hectares per MW

Subtropical humid forest

0 people per MW


Analysis table

Results

Net Present Value: 
191,197 thousand USD
Hectares flooded per MW: 
0 hectares per MW
Gross CO₂ equivalent emissions: 
128 metric tonnes
Gross CO₂ equivalent per MW: 
0 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
1,500 MW
Capacity used: 
90%
Area flooded: 
1 hectare
Vegetation type: 
Subtropical humid forest
People displaced: 
0 people displaced
Construction time: 
6 years
Construction cost: 
1,590,620,000 USD
Transmission infrastructure cost: 
0 USD
Wholesale price of energy: 
46.9 USD
Economic discount rate: 
14.9%

Other analyses of the Coca Codo Sinclair project

No other analyses of this project. Sign in or register now to create a new analysis.