2 thousand MW capacity
Inambari, Inambari, Madre de Dios, Peru
River: Inambari
Status: Proposed project
41 thousand hectares flooded
21 hectares per MW
Mountain (montane) forest
8 thousand people displaced
4 people per MW
669 million PEN
net present value
(Excluding environmental costs)
Analysis table
Results
Net Present Value:
668,657 thousand PEN
NPV including net greenhouse gas emissions:
638,224 thousand PEN
Internal Rate of Return:
10.6%
Hectares flooded per MW:
21 hectares per MW
Gross CO₂ equivalent emissions:
112,811 thousand metric tonnes
Gross CO₂ equivalent per MW:
56,406 metric tonnes per MW
People displaced per megawatt:
4 people per MW Inputs and assumptions
Installed capacity :
2,000 MW
Capacity used:
60%
Area flooded:
41,000 hectares
Vegetation type:
Mountain (montane) forest
People displaced:
8,000 people displaced
Construction time:
5 years
Construction cost:
10,671,988,400 PEN
Transmission infrastructure cost:
882,000,000 PEN
Wholesale price of energy:
186 PEN
Economic discount rate:
10% jfgordilloj
8 April 2011 – 4:48pm
Other analyses of the Inambari project
| Details | Links | Capacity (MW) | Net Present Value | CO₂ emissions (t/MW) | Inundated land (ha/MW) | Displaced people / MW |
|---|---|---|---|---|---|---|
| jose serra vega, Mazuko, Proposed project | View | 2,200 MW | 3,098 million PEN | 100,000 | 17 | 2 |
| Alfonso Malky, Inambari, Madre de Dios, Proposed project | View | 2,200 MW | 926,213 thousand PEN | 53,000 | 17 | 1.0 |
| John Reid, Chiforongo, Proposed project | View | 2,200 MW | -120,844 thousand PEN | 53,000 | 17 | 1 |
Sign in or register now to create a new analysis.
HydroCalculator Tool Help
CSF e-newsletter
I want to know the latest conservation news, and hear about upcoming CSF projects and courses.
Upcoming CSF Courses
CSF offers training in economic tools to empower local conservation organizations, decision-makers, and communities.
Herramientas Económicas para la Conservación en la Amazonía Andina - Perú 2012
Monday, 28 May, 2012 - Friday, 8 June, 2012
Friday, 23 March 2012
Economic Tools for Conservation and Infrastructure Planning in the Albertine Rift
Monday, 11 June, 2012 - Friday, 22 June, 2012
Monday, 30 April 2012
Ferramentas Econômicas para a Conservação e Planejamento de Infraestrutura na Amazônia - Formulário de Inscrição
Monday, 13 August, 2012 - Friday, 24 August, 2012
Friday, 1 June 2012
Comments
Moneda
Parece que se usaron dolares para el costo de la obra y soles para el precio de la energia. El modelo no puede hacer una conversión interna de moneda. Eso resulta en un VAN muy alto.
Algunos Cambios
He cambiado el costo de la construcción para 10.671.988.400 PEN a 3.965.000 PEN y el precio al por mayor de energía a partir de 65 soles a 165 soles, para reflejar los costos más precisos. (Véa el comentario de John Reid)