Inambari, Chiforongo, Peru

Status: Proposed project

17 hectares per MW

Mix of crops & tropical rainforest (50/50)

1 person per MW

Javascript is required to view this map.

Analysis table

Results

Net Present Value: 
-850.0 million USD
Hectares flooded per MW: 
17 hectares per MW
CO₂ emissions: 
13.4 million metric tonnes
CO₂ emissions per MW: 
6,111 metric tonnes per MW
People displaced per megawatt: 
1 person per MW

Inputs and assumptions

Installed capacity : 
2,200 MW
Capacity used: 
60%
Area flooded: 
37,800 hectares
Vegetation type: 
Mix of crops & tropical rainforest (50/50)
People displaced: 
3,261 people displaced
Construction time: 
5 years
Construction cost: 
4,000,000,000 USD
Transmission infrastructure cost: 
0 USD
Wholesale price of energy: 
50 USD
Economic discount rate: 
10%

Other analyses of the Inambari project

No other analyses of this project. Sign in or register now to create a new analysis.