Jispa Hydroelectricity Project, Lahaul And Spiti, Himachal Pradesh, India

River: Bhaga

Status: Proposed project

0 hectares per MW

4 people per MW

Enable javascript to view charts.

Results

Net Present Value-863,066 thousand USD
NPV including net greenhouse gas emissions-840,934 thousand USD
Cost per MWh excluding environmental costs164 USD per MWh
Hectares flooded per MW0 hectares per MW
Gross CO₂ equivalent emissions4,915 metric tonnes
Gross CO₂ equivalent per MW16 metric tonnes per MW
Hectares flooded per MW0 hectares per MW
People displaced per megawatt4 people per MW

Inputs and assumptions

People displaced1,301 people displaced
Area flooded58 hectares
Vegetation type or land coverBoreal Coniferous Forest, Mixed cropland & natural
Carbon density16.5 tC/ha
Installed capacity 300 MW
Capacity used55%
Construction time10 years
Construction cost, including transmission infrastructure costs1,054,527,600 USD
Wholesale price of energy158.7 INR
Economic discount rate10.2%