HydroCalculator

Mira, Provincias Carchi, Imbabura, Esmeraldas; Cantón Mira; Sistema Hidrográfico Mira; Río Baboso , Ecuador

Status: Under construction

9 hectares per MW

0 people per MW

Results

Net Present Value-2,096 thousand USD
Hectares flooded per MW9 hectares per MW
Gross CO₂ equivalent emissions870 metric tonnes
Gross CO₂ equivalent per MW791 metric tonnes per MW
Hectares flooded per MW9 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded10 hectares
Installed capacity 1.1 MW
Capacity used90%
Construction time1.5 years
Construction cost3,500,000 USD
Transmission infrastructure cost0 USD
Wholesale price of energy46.9 USD
Economic discount rate16.9%