Language:

HydroCalculator

Palanda, Zamora-Chinchipe, Ecuador

River: Palada

Status: Under construction

0 hectares per MW

0 people per MW

Map of Zamora-Chinchipe, Ecuador
Enable javascript to view charts.

Results

Net Present Value-4,022 thousand USD
NPV including net greenhouse gas emissions-3,018 thousand USD
Internal Rate of Return9.99%
Cost per MWh excluding environmental costs44 USD per MWh
Hectares flooded per MW0 hectares per MW
Gross CO₂ equivalent emissions951 metric tonnes
Gross CO₂ equivalent per MW56 metric tonnes per MW
Hectares flooded per MW0 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded1 hectare
Installed capacity 17 MW
Capacity used70%
Construction time2 years
Construction cost, including transmission infrastructure costs25,000,000 USD
Wholesale price of energy35 USD
Economic discount rate12%

Vegetation & carbon density

Carbon density
(tC/ha)
Area flooded
(hectares)
Total carbon
(tonnes)
1.5.0150%2.5
2.52.0150%26.0
Total1100%28.5