You are not authorized to post comments.

perl, san pedro, Argentina

Status: Proposed project

0 hectares per MW

Tropical rain forest

0 people per MW

Javascript is required to view this map.

Be the first to start a conversation by posting a comment

Add a comment


Analysis table

Results

Hectares flooded per MW: 
0 hectares per MW
Gross CO₂ equivalent emissions: 
6,442 metric tonnes
Gross CO₂ equivalent per MW: 
644 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
10 MW
Capacity used: 
40%
Area flooded: 
1 hectare
Vegetation type: 
Tropical rain forest
People displaced: 
0 people displaced
Construction time: 
2 years
Construction cost: 
25,000,000 ARS
Transmission infrastructure cost: 
0 ARS
Wholesale price of energy: 
110 USD
Economic discount rate: 
10%

Other analyses of the perl project

No other analyses of this project. Sign in or register now to create a new analysis.