Rene proy, Itaituba, Bolivia

River: Tapajós

Status: Proposed project

2 hectares per MW

Tropical moist deciduous forest

0 people per MW

Be the first to start a conversation by posting a comment

Add a comment


Analysis table

Results

Net Present Value: 
-17,651 million USD
NPV including net greenhouse gas emissions: 
-17,381 million USD
Internal Rate of Return: 
0.860%
Hectares flooded per MW: 
2 hectares per MW
Gross CO₂ equivalent emissions: 
77,941 thousand metric tonnes
Gross CO₂ equivalent per MW: 
8,959 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
8,700 MW
Capacity used: 
60%
Area flooded: 
20,000 hectares
Vegetation type: 
Tropical moist deciduous forest
People displaced: 
1,400 people displaced
Construction time: 
7 years
Construction cost: 
25,000,000,000 USD
Transmission infrastructure cost: 
3,980,000,000 USD
Wholesale price of energy: 
40 USD
Economic discount rate: 
12.8%

Other analyses of the Rene proy project

No other analyses of this project. Sign in or register now to create a new analysis.