Sasanta Yurubamba, Ravelo, Bolivia

River: Ravelo

Status: Proposed project

3 hectares per MW

Shrub cover

0 people per MW

Javascript is required to view this map.

Analysis table

Results

Net Present Value: 
1,103 million USD
NPV including net greenhouse gas emissions: 
1,150 million USD
Internal Rate of Return: 
195%
Hectares flooded per MW: 
3 hectares per MW
Gross CO₂ equivalent emissions: 
4,934 thousand metric tonnes
Gross CO₂ equivalent per MW: 
5,249 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
940 MW
Capacity used: 
70%
Area flooded: 
3,000 hectares
Vegetation type: 
Shrub cover
People displaced: 
400 people displaced
Construction time: 
5 years
Construction cost: 
5,000,000 USD
Transmission infrastructure cost: 
200,000 USD
Wholesale price of energy: 
40 USD
Economic discount rate: 
12.8%

Comments

Capacidad Instalada

He cambiado la capacidad instalada de 2.000 MW a 940 MW para ser un análisis más preciso.

Other analyses of the Sasanta Yurubamba project

No other analyses of this project. Sign in or register now to create a new analysis.