At least one input in this analysis appears to be unrealistic. Internal Rates of Return should be between -5% and 25%. The IRR of this analysis is 88%. Check the units and currencies for errors.

sierra nevada de santa marta, magdalena, Colombia

River: Magdalena

Status: In Operation

12 hectares per MW

12 people per MW

Enable javascript to view charts.

Results

Net Present Value1,532 billion COP
NPV including net greenhouse gas emissions1,528 billion COP
Internal Rate of Return88.0% (unrealistic)
Hectares flooded per MW12 hectares per MW
Gross CO₂ equivalent emissions15,260 thousand metric tonnes
Gross CO₂ equivalent per MW36,333 metric tonnes per MW
Hectares flooded per MW12 hectares per MW
People displaced per megawatt12 people per MW

Inputs and assumptions

People displaced5,000 people displaced
Area flooded5,000 hectares
Vegetation type or land coverAmericas; Tropical Rainforest; Forest, Cropland Mosaic; Non-Frontier - 96.5
Carbon density96.50 tC/ha
Installed capacity 420 MW
Capacity used80%
Construction time5 years
Construction cost43,000,000,000 COP
Transmission infrastructure cost9,000,000,000 COP
Wholesale price of energy80,000 COP
Economic discount rate10%