Results

Net Present Value-564,175 thousand USD
NPV including net greenhouse gas emissions-555,254 thousand USD
Internal Rate of Return6.24%
Cost per MWh excluding environmental costs57 USD per MWh
Hectares flooded per MW8 hectares per MW
Gross CO₂ equivalent emissions2,003 thousand metric tonnes
Gross CO₂ equivalent per MW2,442 metric tonnes per MW
Hectares flooded per MW8 hectares per MW
People displaced per megawatt0 people per MW

Inputs and assumptions

People displaced0 people displaced
Area flooded6,960 hectares
Installed capacity 820 MW
Capacity used70%
Construction time5 years
Construction cost, including transmission infrastructure costs1,740,000,000 USD
Wholesale price of energy40 USD
Economic discount rate10%

Vegetation & carbon density

Carbon density
(tC/ha)
Area flooded
(hectares)
Total carbon
(tonnes)
1.87.04,17660%363,312.0
2.5.02,78440%13,920.0
Total6,960100%377,232.0