228 MW capacity
Toachi - Pilatón, Provincia Santo Domingo de los Sachilas; Cantón Sa, Ecuador
Status: Under construction
34 hectares flooded
0 hectares per MW
Mountain (montane) forest
99 million USD
net present value
(Excluding environmental costs)
Javascript is required to view this map.
Be the first to start a conversation by posting a comment
Analysis table
Results
Net Present Value:
98,534 thousand USD
Hectares flooded per MW:
0 hectares per MW
Gross CO₂ equivalent emissions:
10,687 metric tonnes
Gross CO₂ equivalent per MW:
47 metric tonnes per MW
People displaced per megawatt:
0 people per MW Inputs and assumptions
Installed capacity :
228 MW
Capacity used:
90%
Area flooded:
33.5 hectares
Vegetation type:
Mountain (montane) forest
People displaced:
0 people displaced
Construction time:
4 years
Construction cost:
420,000,000 USD
Transmission infrastructure cost:
0 USD
Wholesale price of energy:
46.9 USD
Economic discount rate:
10%
Submitted by John Reid on 23 October 2009 - 9:04pm
Other analyses of the Toachi - Pilatón project
| Details | Links | Capacity (MW) | Net Present Value | CO₂ emissions (t/MW) | Inundated land (ha/MW) | Displaced people / MW |
|---|---|---|---|---|---|---|
| José Galindo, Provincia Santo Domingo de los Sachilas; Cantón Sa, Under construction | View | 228 MW | -158,343 thousand USD | 13 | 0.15 | 0 |
Sign in or register now to create a new analysis.
HydroCalculator Tool Help
CSF e-newsletter
I want to know the latest conservation news, and hear about upcoming CSF projects and courses.
Upcoming CSF Courses
No upcoming courses. See archived courses.
0 people displaced
0 people per MW