Toachi - Pilatón, Provincia Santo Domingo de los Sachilas; Cantón Santo Domingo; Sistema hidrográfico Esmeraldas; Río Pilatón´- Toachi, Ecuador

Status: Under construction

0 hectares per MW

Mountain (montane) forest

0 people per MW

Javascript is required to view this map.

Be the first to start a conversation by posting a comment

Add a comment


Analysis table

Results

Net Present Value: 
-158,343 thousand USD
Hectares flooded per MW: 
0 hectares per MW
Gross CO₂ equivalent emissions: 
2,915 metric tonnes
Gross CO₂ equivalent per MW: 
13 metric tonnes per MW
People displaced per megawatt: 
0 people per MW

Inputs and assumptions

Installed capacity : 
228 MW
Capacity used: 
90%
Area flooded: 
33.5 hectares
Vegetation type: 
Mountain (montane) forest
People displaced: 
0 people displaced
Construction time: 
4 years
Construction cost: 
420,000,000 USD
Transmission infrastructure cost: 
0 USD
Wholesale price of energy: 
46.9 USD
Economic discount rate: 
20%

Other analyses of the Toachi - Pilatón project

Details Links Capacity (MW) Net Present Value CO₂ emissions (t/MW) Inundated land (ha/MW) Displaced people / MW
John Reid, Provincia Santo Domingo de los Sachilas; Cantón Sa, Under construction View 228 MW 98,534 thousand USD 47 0.15 0