237 MW capacity
Usina Hidrelétrica de Boa Esperança, Piauí, Brazil
River: Rio Parnaíba
Status: In Operation
9 thousand hectares flooded
37 hectares per MW
Shrub cover
418 million BRL
net present value
(Excluding environmental costs)
Javascript is required to view this map.
Be the first to start a conversation by posting a comment
Analysis table
Results
Net Present Value:
418,047 thousand BRL
NPV including net greenhouse gas emissions:
408,157 thousand BRL
Internal Rate of Return:
25.0%
Hectares flooded per MW:
37 hectares per MW
Gross CO₂ equivalent emissions:
14,122 thousand metric tonnes
Gross CO₂ equivalent per MW:
59,511 metric tonnes per MW
People displaced per megawatt:
4 people per MW Inputs and assumptions
Installed capacity :
237.3 MW
Capacity used:
70%
Area flooded:
8,750 hectares
Vegetation type:
Shrub cover
People displaced:
1,000 people displaced
Construction time:
6 years
Construction cost:
230,000,000 BRL
Transmission infrastructure cost:
60,000,000 BRL
Wholesale price of energy:
100 BRL
Economic discount rate:
12% IgorPCV
30 August 2011 – 7:16pm
Other analyses of the Usina Hidrelétrica de Boa Esperança project
| Details | Links | Capacity (MW) | Net Present Value | CO₂ emissions (t/MW) | Inundated land (ha/MW) | Displaced people / MW |
|---|---|---|---|---|---|---|
| fabio renault, guadalupe piauí, In Operation | View | 237 MW | 1,630 million BRL | 60,000 | 37 | 4 |
| IgorPCV, guadalupe piauí, In Operation | View | 237 MW | 418,047 thousand BRL | 60,000 | 37 | 4 |
Sign in or register now to create a new analysis.
HydroCalculator Tool Help
CSF e-newsletter
I want to know the latest conservation news, and hear about upcoming CSF projects and courses.
Upcoming CSF Courses
CSF offers training in economic tools to empower local conservation organizations, decision-makers, and communities.
Herramientas Económicas para la Conservación en la Amazonía Andina - Perú 2012
Monday, 28 May, 2012 - Friday, 8 June, 2012
Friday, 23 March 2012
Economic Tools for Conservation and Infrastructure Planning in the Albertine Rift
Monday, 11 June, 2012 - Friday, 22 June, 2012
Monday, 30 April 2012
Ferramentas Econômicas para a Conservação e Planejamento de Infraestrutura na Amazônia - Formulário de Inscrição
Monday, 13 August, 2012 - Friday, 24 August, 2012
Friday, 1 June 2012
1,000 people displaced
4 people per MW